DISPUTE BOARD AS AN ALTERNATIVE FOR CONSTRUCTION DISPUTE SETTLEMENT IN SUTT DEVELOPMENT CONTRACTS AT PT PLN (PERSERO)

  • Haryo Wisnuaji
Keywords: Contract, Dispute, Cost, Resolution, Method

Abstract

Transmission construction projects have very complex problems and difficulties due to the very dynamic type of work combining various types of interrelated engineering and non-engineering work, this results in frequent disputes where the applicable Contract or the Agreement itself does not have a clear way to resolve the problem and makes the parties firmly defend their respective arguments. This raises more complicated problems and is often resolved in a simple way which can actually cause conflict in the future, even causing legal problems when an audit occurs. Through the construction services law no. 2 of 2017 article 88 it has been stated that alternative dispute resolution can be through the formation of a dispute council. This needs to be changed in the type of transmission construction contract within the PT PLN (Persero) environment considering that Disputes are difficult to avoid when they have a direct impact on the project. Changes need to be made immediately to every transmission construction contract within the PT PLN (Persero) environment.
Published
2025-04-08