Articles
Mediation In The Resolution Of Construction Disputes In The 500 Kv Sumatra Transmission Project
Adi Saputro, Era Fransiska, sami'an, Sarwono Hardjomuljadi
1-14
pdf
COMPARATIVE STUDY OF ALTERNATIVE DISPUTE RESOLUTION IN INDONESIA AND VIETNAM
Angga Dwian Prakoso, Sarwono Hardjomuljadi, Dwi Edi Wibowo
15-24
pdf
LEGAL ASPECTS OF CONSTRUCTION FAILURES (Based on Law Number 2 of 2017 on Construction Services)
Anrizal
25-43
pdf
ROLE OF ALTERNATIVE DISPUTE RESOLUTION (ADR) NON-LITIGATION ABOUT CONSTRUCTION SERVICES IN THE REPUBLIC OF INDONESIA
ARIF ROHMAN
44-50
pdf
COMPARING CIVIL AND COMMON LAW (INDONESIA AND UNITED STATES OF AMERICA) ON ALTERNATIVE DISPUTE RESOLUTION IMPLEMENTATION
Atik Amalia Khusnawati
51-59
pdf
JURIDICAL OVERVIEW ALTERNATIVE DISPUTE RESOLUTION IN INDONESIA: LEGAL FRAMEWORK
Ayuningtyas Pratita Sarwono, Hannafied Tedjo
61-67
pdf
ALTERNATIVE DISPUTE RESOLUTION IN HYDROELECTRIC POWER PLANT CONSTRUCTION THROUGH A STANDING DISPUTE BOARD : A CASE STUDY OF ASAHAN 3 HEPP (2 X 87 MW)
Bayu Wisatrioda
68-85
pdf
THE IMPACT OF REVOCATION OF DETERMINATION OF DEVELOPMENT LOCATION ON CONSTRUCTION OF THE SAPANANG OVERPASS DEVELOPMENT
Deby Hospital
86-96
pdf
THE IMPACT OF THE COMMON LAW SYSTEM AND CIVIL LAW SYSTEM ON THE DEVELOPMENT OF ALTERNATIVE DISPUTE RESOLUTION (ADR) IN INDONESIA
Dinda Putri Santoso
97-101
pdf
ALTERNATIVES DISPUTE RESOLUTION FOR CONSTRUCTION OUTSIDE THE COURT THROUGH “PERKUMPULAN AHLI DEWAN SENGKETA KONSTRUKSI” (PADSK): ADVANTAGES AND WEAKNESSES
Elfriandi
102-112
pdf
Dispute Resolution in Small Capacity Hydroelectric Power Plant Project case study PLTM Paraeng in West Java.
Eric Baroroh, Sami’an, Sarwomo Hardjomuljadi, As’ari TR
113-124
pdf
Dispute Resolution in Green Building Projects: Civil Law Perspective in Indonesia
Yuwono Imanto
125-132
pdf
ALTERNATIVE DISPUTE RESOLUTION (ADR) IN CONSTRUCTION FAILURE CASES AND LEGAL CONSEQUENCES
Ifdal Baharuddin
133-142
pdf
PERSPECTIVE FROM ALTERNATIVE OF CONSTRUCTION DISPUTE RESOLUTION THROUGH CONSTRUCTION DISPUTE COUNCIL IN INDONESIA
Wida Pramudya Bayu Adhi
143-152
pdf
DISPUTE RESOLUTION IN CONSTRUCTION THROUGH ARBITRATION: CONTRACT CLAIMS FOR JAVA SUBMARINE CABLES 150 KV CIRCUIT 3 & 4 (REPLACEMENT & REINFORCEMENT)
Iwan Arif Setiyawan
153-170
pdf
UNDERSTANDING ALTERNATIVE CONSTRUCTION DISPUTE RESOLUTIONS IN COMMON LAW AND CIVIL LAW COUNTRIES
Putut Marhayudi, niniek lanyati
178-186
pdf
THE ROLE OF THE INDONESIAN NATIONAL ARBITRATION BOARD (BANI) IN PROVIDING BINDING OPINIONS TO PREVENT CONSTRUCTION CONTRACT DISPUTES
Prasetyo Efendy
171-177
pdf
THE USE OF A DISPUTE BOARD FOR RESOLVING DISPUTES IN THE RIAU GAS ENGINE POWER PLANT (PEAKER) 200 MW PROJECT
qadri
187-201
pdf
APPROACHING ALTERNATIVE DISPUTE RESOLUTION NEGOTIATION METHOD IN CONSTRUCTION DISPUTE RESOLUTION ASPECT OF AMDAL STUDY IN ELECTRICAL INFRASTRUCTURE PROJECTS
Reza Rafly Sebastian
202-212
pdf
ALTERNATIVE DISPUTE RESOLUTION IN CONSTRUCTION LAW: NAVIGATING DISPUTE RESOLUTION PATHWAYS IN COMMON AND CIVIL LAW FRAMEWORKS
sutikno
213-223
pdf