##navigation.skip.main##
##navigation.skip.nav##
##navigation.skip.footer##
International Conference on Construction Law and Infrastructure Governance (ICCLIG)
Terkini
##navigation.archives##
Tentang Kami
Tentang Jurnal Ini
Penyerahan
##manager.setup.privacyStatement##
Contact
Dewan Editor
Reviewer
Cari
Cari
Daftar
Login
##common.homepageNavigationLabel##
##navigation.breadcrumbSeparator##
##navigation.archives##
##navigation.breadcrumbSeparator##
Vol 1 No 01 (2024): International Seminar Alternative Dispute Resolution in Common and Civil Law Countries
Diterbitkan:
2025-04-08
Articles
SUPERVISI HUKUM TERHADAP PEJABAT PEMBUAT KOMITMEN (PPK) DALAM PELAKSANAAN PEKERJAAN KONSTRUKSI
Eval Diansyah
1-23
PDF (English)
HARMONIZATION IN ENHANCING THE EFFECTIVENESS OF ALTERNATIVE DISPUTE RESOLUTION IN COMMON LAW AND CIVIL LAW COUNTRIES
Kharisman Laia
24-32
PDF (English)
DISPUTE RESOLUTION IN GREEN BUILDING PROJECTS: CIVIL LAW PERSPECTIVE IN INDONESIA
Yuwono Imanto, Sarwono Hardjomuljadi, Sami’an
33-39
PDF (English)
PERSPECTIVE FROM ALTERNATIVE OF CONSTRUCTION DISPUTE RESOLUTION THROUGH CONSTRUCTION DISPUTE COUNCIL IN INDONESIA
Wida Pramudya Bayu Adhi
40-47
PDF (English)
ALTERNATIVE DISPUTE RESOLUTION IN CONSTRUCTION LAW: NAVIGATING DISPUTE RESOLUTION PATHWAYS IN COMMON AND CIVIL LAW FRAMEWORKS
Sutikno
48-56
PDF (English)
ALTERNATIVE DISPUTE RESOLUTION OF CIVIL CASES AT COURT
Sukma Asmara
57-63
PDF (English)
ANALISIS KONFLIK HUKUM DALAM PROYEK KONSTRUKSI DI INDONESIA: STUDI TENTANG PENYELESAIAN SENGKETA, DASAR HUKUM, DAN EVALUASI IMPLEMENTASI
Steven Valerian Brouwer
64-71
PDF (English)
DISPUTE DALAM KONTRAK PERJANJIAN KERJASAMA KONSTRUKSI
Samsul Purba
72-76
PDF (English)
ALTERNATIVE DISPUTE RESOLUTION IN CONSTRUCTION CONTRACT IN INDONESIA
Roni Febrianto
77-82
PDF (English)
THE EFFECTIVENESS OF DISPUTE RESOLUTION THROUGH THE DISPUTE BOARD IN CASES OF FAILURE TO FULFILL TKDN COMMITMENTS IN PT PLN (PERSERO) CONTRACTS
Ronald Lapasau
83-90
PDF (English)
ANALYSIS OF CONSTRUCTION DISPUTE RESOLUTION THROUGH ADJUDICATION AND ITS COMPARISON WITH ARBITRATION
Rizky Regannaldo Fajarrahman
91-100
PERBANDINGAN KONTRAK KONVENSIONAL (HARGA SATUAN) DAN KONTRAK RANCANG BANGUN (DESIGN & BUILD)
Rizal
101-114
PDF (English)
APPROACHING ALTERNATIVE DISPUTE RESOLUTION NEGOTIATION METHOD IN CONSTRUCTION DISPUTE RESOLUTION ASPECT OF AMDAL STUDY IN ELECTRICAL INFRASTRUCTURE PROJECTS
Reza Rafly Sebastian
115-123
PDF (English)
ANALYSIS OF CHANGES IN THE ENGINEER CLAUSE IN THE FIDIC SECOND EDITION REPRINTED 2022 CONTRACT
Reynaldo Albertiny
124-137
PDF (English)
UNDERSTANDING ALTERNATIVE CONSTRUCTION DISPUTE RESOLUTIONS IN COMMON LAW AND CIVIL LAW COUNTRIES
Putut Marhayudi, Niniek Lannyati
138-146
PDF (English)
EFECTIVENESS OF MEDIATION AS A DISPUTE RESOLUTION METHOD IN IMPLEMENTATION OF ALTERNATIVE DISPUTE RESOLUTION IN INDONESIA
Purnaning Siwi Kusumastuti
147-152
PDF (English)
PENYELESAIAN PERSELISIHAN PERJANJIAN PEMBANGUNAN PEMBANGKIT LISTRIK TENAGA MINIHYDRO (PLTM) BONEHAU 2 X 2000 kW
Ronny Aprisaputra
153-161
PDF (English)
THE ROLE OF THE INDONESIAN NATIONAL ARBITRATION BOARD (BANI) IN PROVIDING BINDING OPINIONS TO PREVENT CONSTRUCTION CONTRACT DISPUTES
Prasetyo Efendy
162-168
PDF (English)
AN OVERVIEW OF THE PRINCIPLE OF LEGALITY: COMMON LAW VS CIVIL LAW POTRET ASAS LEGALITAS DALAM HUKUM PIDANA: COMMON LAW VS CIVIL LAW
Pandu Irawan
169-176
PDF (English)
SEVERITY OFCRIMINAL CHARGES INLAWENFORCEMENT OF CORRUPTION CASES IN INDONESIA
Noven Verderikus Month
177-181
PDF (English)
PENYELESAIAN PERSELISIHAN PERJANJIAN JUAL BELI TENAGA LISTRIK (POWER PURCHASE AGREEMENT) PEMBANGKIT IPP MELALUI INTERNATIONAL CHAMBERS OF COMMERCE (ICC)
Ndaru Seto Widiatmoko
182-186
PDF (English)
IMPLEMENTATION OF TRIPARTITE TURNKEY CONTRACT ON CONSTRUCTION AND FINANCING OF 500 kV TRANSMISSION PROJECT IN SUMATRA (Package 1 & 2)
Mohamad Indrayana
187-194
PDF (English)
ESTABLISHMENT OF A DISPUTE BOARD FOR ON GOING PROJECT
Mahfiar Fajar Akbar Sumantri
195-200
PDF (English)
CONSTRUCTION DISPUTE RESOLUTION THROUGH DISPUTE BOARDS (Case Study: Power Plant Project in Indonesia)
Lutfi Mustakim
201-212
PDF (English)
ANALISIS PEMUTUSAN KONTRAK DAN ALTERNATIVE DISPUTE RESOLUTION PADA PROYEK PEMBANGUNAN SUTET 275 KV PHI INCOMER MUARA ENIM JALUR 1
Junaedi
213-220
PDF (English)
EARLY NEUTRAL EVALUATION IN THE CONTEXT OF ALTERNATIVE DISPUTE RESOLUTION IN COMMON LAW AND CIVIL LAW SYSTEMS IN CONSTRUCTION DISPUTES; CONTEXT AND POTENTIAL IN INDONESIA
John H P Girsang
221-227
PDF (English)
DAAB AS A COLLABORATIVE DISPUTE RESOLUTION UNDER FIDIC RED BOOK 2017 2nd EDITION
Jo Johnson
228-235
PDF (English)
DISPUTE RESOLUTION MECHANISMS FOR HEALTH, SAFETY & ENVIRONMENT CLAUSES BETWEEN COMMON LAW & CIVIL LAW JURISDICTIONS
Jaka Adiprasetya W
236-239
PDF (English)
DISPUTE RESOLUTION IN CONSTRUCTION THROUGH ARBITRATION: CONTRACT CLAIMS FOR JAVA SUBMARINE CABLES 150 KV CIRCUIT 3 & 4 (REPLACEMENT & REINFORCEMENT)
Iwan Arif Setiyawan
240-255
EMPIRICAL JURIDICAL REVIEW OF THE IMPLEMENTATION OF EPC CONTRACTS AT THE JBHSR PROJECT
Iskandar, Sarwono Hardjomuljadi, Sami’an
256-266
PDF (English)
COMPLETION DISPUTE SERVICE CONSTRUCTION THROUGH DISPUTE BOARD
Imron Rosyadi
267-273
PDF (English)
ALTERNATIVE DISPUTE RESOLUTION (ADR) IN CONSTRUCTION FAILURE CASES AND LEGAL CONSEQUENCES
Ifdal Baharuddin
274-281
PDF (English)
METODE EVALUASI PERHITUNGAN GANTI RUGI AKIBAT PENGHENTIAN KONTRAK
Hidbar Roberta Saragih
282-291
PDF (English)
MONOPOLI DAN PERSAINGAN USAHA TIDAK SEHAT
Hasan Fauzi
292-299
PDF (English)
DISPUTE BOARD AS AN ALTERNATIVE FOR CONSTRUCTION DISPUTE SETTLEMENT IN SUTT DEVELOPMENT CONTRACTS AT PT PLN (PERSERO)
Haryo Wisnuaji
300-310
PDF (English)
LEGAL ANALYSIS OF COOPERATION CONTRACTS FOR PROFIT-SHARING IN SOLAR POWER PLANTS (PLTS) BASED ON FIDIC PRINCIPLES AND IT’S IMPLICATIONS FOR ALTERNATIVE DISPUTE RESOLUTION IN COMMON LAW AND CIVIL LAW SYSTEMS
Handoko Tejo, Sami’an, Sarwono Hardjomuljadi
311-321
PDF (English)
ARBITRASE SEBAGAI SOLUSI PENYELESAIAN SENGKETA PERBEDAAN PENAFSIRAN PERJANJIAN KONTRAK KONSTRUKSI
Agung Aprianto
322-332
PDF (English)
ALTERNATIVE CONSTRUCTION DISPUTE RESOLUTION THROUGH DISPUTE RESOLUTION BOARD IN INDONESIA - STAGES AND LESSONS LEARNED
Agus Iswahyudi
333-345
PDF (English)
PENYELESAIAN SENGKETA PENGADAAN TANAH MELALUI PENITIPAN GANTI KERUGIAN PADA PROYEK PLTA KUMBIH
Alfredo Pakpahan
346-351
PDF (English)
ARBITRASE SEBAGAI SOLUSI PENYELESAIAN KLAIM BIAYA KONSTRUKSI AKIBAT PEMBERIAN PERPANJANGAN WAKTU
Amaliyah Noor Indahwati
352-362
PDF (English)
PERAN KONTRAK STANDAR DALAM MENDEFINISIKAN KEWAJIBAN CACAT: PELAJARAN DARI STUDI KASUS GLOBAL DAN PENERAPANNYA DALAM BISNIS KONSTRUKSI INDONESIA
Anjar Kuswijanarko
363-370
PDF (English)
THE SIGNIFICANCE OF OPAL TOWERS’ CONSTRUCTION DEFECTS IN SHAPING BUILDING INDUSTRY REGULATORY REFORMS
Anor Sihombing
371-376
PDF (English)
LEGAL ASPECTS OF CONSTRUCTION FAILURES (Based on Law Number 2 of 2017 on Construction Services)
Anrizal
377-392
PDF (English)
STATE RESPONSIBILITY FOR THE IMPACT OF RANSOMWARE ATTACKS ON THE TEMPORARY NATIONAL DATA CENTER (PDNS)
Setyo Utomo
393-404
PDF (English)
GUGATAN SEDERHANA SEBAGAI ALTERNATIF PENYELESAIAN KREDIT MACET DALAM HAL OBJEK PERKARA TELAH DIBEBANI HAK TANGGUNGAN (PUTUSAN NOMOR 48/Pdt.G.S/2023/PN Pkl)
Guntur Risqi Mahardika, Anik Kunantiyorini , Aditya Migi Prematura
405-416
PDF (English)
TANGGUNG JAWAB DIREKSI DAN DEWAN KOMISARIS PERSEROAN TERBATAS DALAM PEMBERIAN CORPORATE GUARANTEE (STUDI PUTUSAN PENGADILAN NOMOR: 147/Pdt.G/2022/PN. Bpp)
Jihaan Shabri Rahiidah, Anik Kunantiyorini , Aditya Migi Prematura
417-428
PDF (English)
KAJIAN HUKUM TENTANG CORPORATE SOCIAL RESPONBILITY (CSR) DALAM MENSEJAHTERAHKAN MASYARAKAT LINGKUNGAN PERUSAHAAN PT. NDONESIA BATANG
Maharani Octavia Yosie Saputri, Anik Kunantiyorini , Aditya Migi Prematura
429-446
PDF (English)
COMPARING CIVIL AND COMMON LAW (INDONESIA AND UNITED STATES OF AMERICA) ON ALTERNATIVE DISPUTE RESOLUTION IMPLEMENTATION
Atik Amalia Khusnawati
447-455
JURIDICAL OVERVIEW ALTERNATIVE DISPUTE RESOLUTION IN INDONESIA: LEGAL FRAMEWORK
Ayuningtyas Pratita Sarwono, Hannafied Tedjo
456-462
PDF (English)
HAMBATAN PEMBERANTASAN KORUPSI MELALUI PENDEKATAN ADMINISTRATIF
Bagus Hanindiyo Mantri
463-480
PDF (English)
ALTERNATIVE DISPUTE RESOLUTION IN HYDROELECTRIC POWER PLANT CONSTRUCTION THROUGH A STANDING DISPUTE BOARD : A CASE STUDY OF ASAHAN 3 HEPP (2 X 87 MW)
Bayu Wisatrioda
481-497
PDF (English)
MECHANISM OF ALTERNATIVE DISPUTE RESOLUTION FOR CONSTRUCTION DISPUTES AT BADAPSKI (BADAN ARBITRASE DAN ALTERNATIF SENGKETA KONSTRUKSI INDONESIA)
David Mangara Pasaribu
498-504
PDF (English)
ALTERNATIVE DISPUTE RESOLUTION IN COMMON AND CIVIL LAW COUNTRIES
Eko Rahmiko
505-514
PDF (English)
DISPUTE RESOLUTION IN SMALL CAPACITY HYDROELECTRIC POWER PLANT PROJECT CASE STUDY PLTM PARAENG IN WEST JAVA
Eric Baroroh, Sami’an, Sarwono Hardjomuljadi
515-526
PDF (English)
SETTLEMENT OF DISPUTES REGARDING THE USE OF REAL WAGES IN THE PRICE ADJUSTMENT FORMULA THROUGH BANI
Bimas Tianggono
527-545
PDF (English)
THE IMPACT OF REVOCATION OF DETERMINATION OF DEVELOPMENT LOCATION ON CONSTRUCTION OF THE SAPANANG OVERPASS DEVELOPMENT
Deby Hospital
546-555
PDF (English)
TINJAUAN YURIDIS TERHADAP PELAKSANAAN PEKERJAAN KONSTRUKSI PEMBANGUNAN RUMAH SAKIT DI INDONESIA
Erfianto Riesa Nursamsi
556-571
PDF (English)
APPLICATION OF LAW IN THE DYNAMICS OF LEGAL CHANGE (CASE STUDY OF ENVIRONMENTAL PERMITS ON THE DUKU BIM BRIDGE CONSTRUCTION PLANNING PROJECT IN WEST SUMATRA PROVINCE)
Eko Suliyanto
572-594
PDF (English)
PENYELESAIAN KLAIM DENGAN ENGINEER DETERMINATION AKIBAT KONDISI FISIK YANG TIDAK DAPAT DIPERKIRAKAN SEBELUMNYA PADA PERGERAKAN TANAH DI AREA TIMBUNAN BUKITSARI PROYEK JALAN BEBAS HAMBATAN JAWA BAGIAN BARAT
Hambali
595-614
PDF (English)
THE USE OF A DISPUTE BOARD FOR RESOLVING DISPUTES IN THE RIAU GAS ENGINE POWER PLANT (PEAKER) 200 MW PROJECT
Qadri
615-627
PDF (English)
DUALISME HUKUM PAJAK BUMI DAN BANGUNAN PEDESAAN DAN PERKOTAAN (PBB-P2) ATAS TOWER SALURAN UDARA TEGANGAN TINGGI (SUTT) PT PLN (PERSERO)
Rizal Hikmahtiar
628-640
PDF (English)
Bahasa
English
Bahasa Indonesia
Informasi
Untuk Pembaca
Untuk Penulis
Untuk Pustakawan